Facilities Management will perform numerous maintenance and improvement projects during the winter campus closure. The majority will be conducted between Dec. 22 – Jan. 3. The full list of projects is as follows:
- Campus-wide Fire Life Safety Testing (Non-Housing Units): 12/17/2021 – 01/07/2022
- Campus-wide Fire Life Safety Testing E-Power Testing (Non-Housing Units): 12/22/2021 – 12/23/2021
- *Lot A Parking Lot Striping: 12/21/2021 – 01/07/2022
- *Smith Softball Field Lights: 12/08/2021 – 01/31/2022
- *Loyola Gate Infrastructure Improvements: 12/22/2021 – 01/07/2022
- *Campus Street Paving: 12/22/2021 – 01/07/2022
- Doheny Hall Switchgear Replacement: 12/21/2021 – 12/21/2021
- *Doolan Hall Elevator Modernization: 11/01/2021 – 01/31/2022
- Hannon Apartments Heat Exchanger Replacement:12/21/2021 – 12/23/2021
- Howard Fitzpatrick Pavilion Signage Installation: 12/21/2021 – 12/28/2021
- Hilton Switchgear Maintenance (12-hour Power Outage): 12/28/2021 – 12/28/2021
- *Hannon Loft Elevator Modernization: 12/15/2021 – 01/31/2022
- Malone HVAC Replacement: 12/22/2021 – 12/22/2021
- McCarthy Hall HVAC Replacement: 12/22/2021 – 01/03/2022
- Ignatian Circle Manhole Repair: 12/27/2021 – 01/03/2022
- Seaver Hall HVAC Replacement: 12/22/2021 – 12/28/2021
- University Hall Switchgear Maintenance (12-hour Power Outage): 12/22/2021 – 12/22/2021
- University Hall Elevator 1st floor Lobby and Cab Flooring Replacement: 12/22/2021 – 01/07/2022
*Subject to schedule revisions based on weather and material lead time.